Pavilion "Simonis"

Contractor: DAVL Studio
Architect: Castermans Engineers
Constructor: Meesterbouw

Activities Dijkstaal:
The supply and assembly of approx. 35 tons of steel consisting of the supply and assembly of the main steel construction, supply and assembly of steel roof panels.
The steel construction is partly galvanized and powder coated and the steel inner columns were supplied by us prefabricated fire-resistant coated.

The building is designed as two stacked volumes, with the upper one being larger than the lower one.
The lower part mainly consists of a repetition of wood and glass. The upper part is covered with a glittering mosaic. The steel columns in the façade are placed at random angles and clad with wood. There are round windows in the upper façade and in the interior.

A building that fits the Catch by Catch by Simonis